LED工矿灯100W无功率驱动器符合RoHS CE / UL / SAA / FCC年质保

议价
加入意向LED工矿灯100W无功率驱动器符合RoHS CE / UL / SAA / FCC 5yearsWarranty
规范:
新的可调光LED工矿,GK415-100W
无驱动电源5年品质保证
纳米散热技术
编号:HNS-100W
LED(PCS):144 PC双芯片5730SMD(无±)
尺寸(mm):160x120x500mm
功率(瓦特):100W
流明(lm):10000-11000Lm
色温(K):2700-8000K
使用寿命(小时):50000-100000hours(产品生命= LED的寿命)
电压(V):110 / 220-300VAC 50-60HZ
PFC:≥0.8-0.95
角:45°90°120°
LED的温度(25℃,表面temperature≤70℃)
可调光:是的
IP:IP68
应用:
在LED泛光灯可在隧道,地铁,公交站,地下车库,健身房,广场,广告板,广域照明和建筑照明等使用。
使用额定电压前,请检查电源是否符合该产品
警告:
在灯具,必须切断电源,确保安全
当亮起灯的温度,灯具不靠近易燃物品
备注:
灯或刚熄灯,不要用手或皮肤接触灯具
请不要在密封的场合不能使用,缩短灯泡寿命
环境温度,不超过40摄氏度,以避免失败的照明
在改变灯具,必须切断电源,确保安全
请向专业人士来安装灯具,以避免电击
包:
10PC /箱,可根据客户的要求。
我们的任期:
1.最小起订量:10PCS欢迎。
2.5天导致时间的样品,并10天散。
3.通常我们接受T / T,贝宝和西联汇款。
4. DHL / UPS /联邦快递/ TNT快递,海,空交通为你的选择。
Led high bay light 100W without power driver CE RoHS/ UL/ SAA/ FCC 5yearsWarranty
SPECIFICATION:
NEW Dimmable LED High bay-GK415-100W
No drive power supply 5 years quality guarantee
Nano heat dissipation technology
Code: HNS-100W
LED (PCS) : 144 PC Dual chip 5730SMD (No±)
Size (MM) : 160x120x500mm
Power (WATT) : 100W
Lumen (LM) : 10000-11000Lm
Color Temp (K) : 2700-8000K
Using life (Hours) : 50000-100000hours (Product life = the LED life)
Voltage (V) : 110/220-300VAC 50-60HZ
PFC: ≥0.8-0.95
Angle: 45° 90° 120°
Led Temperature (25℃, surface temperature≤70℃ )
Dimmable: yes
IP: IP68
APPLICATION:
The Led Flood lights could be used in tunnel, metro, bus-station, underground parking garage, gym, square, advertising board , wide area lighting and architecture lighting and so on.
Please check whether the power supply is accord with the product before using the rated voltage
Warning:
In lamps and lanterns, must shut off the power, to ensure safety
When lit lamp temperature, lamps and lanterns is not close to flammable items
REMARK:
Lamps or just the lights out, not by hand or skin touch lamps and lanterns
Do not use in the sealing occasions, to shorten the lamp life
Lighting of the ambient temperature, not more than 40 degrees C, so as to avoid failure
Before change the lamps and lanterns, must shut off the power, to ensure safety
Please to the professionals to install lamps and lanterns, in order to avoid electric shock
PACKAGE:
10PC/ box, according to customer's requirement.
OUR TERM:
1. MOQ: 10PCS welcome.
2.5days lead time for samples, and 10days for bulk.
3. Usually we accept T/ T, Paypal, and Western union to pay.
4. DHL/ UPS/ FedEx/ TNT Express, sea and air transportation for your options.
