中国工厂高流明半螺旋8000H CE.RoHS.ISO900 CFL灯
| 包装细节: | CFL灯1.吸塑盒/彩盒/泡沫箱2. 1个/盒,100盒/箱3.外箱尺寸:53 * 26 * 24 |
|---|---|
| 交货详细信息: | 使得订单确认后40天 |
创业板CFL灯的功能
1,节能灯的光可与E14 / E27 / E26 / B22帽
2.超长寿命节能灯的光:≥8000小时
3,性能稳定,故障率低
4.良好的质量与竞争力的价格
5,适用于住宅,超市,酒店,办公...
6.节省80%的能量比普通白炽灯
7.无噪音,无眩光,保护眼睛,绿色环保
CFL灯
T2半螺节能灯的光
编号。 | 功率(W) | 流明(LM) | 灯头 | 宽度尺寸(mm) | 长度尺寸(mm) | 包 | 纸箱(CM) |
| DEM / S-5 | 5 | ≥250 | E14 / E27 / E36 / B22 | 45 | 90 | 100 | 53*26*24 |
| DEM / S-7 | 7 | ≥340 | E14 / E27 / E36 / B22 | 45 | 95 | 100 | 53*26*25 |
| DEM / S-9 | 9 | ≥440 | E14 / E27 / E36 / B22 | 45 | 100 | 100 | 53*26*26 |

CFL灯的生产工艺





展览


认证 - CFL灯:
质量第一的使命“,严格控制质量控制的,与六西格马管理,大部分产品已获得CE犹太认证,已通过ISO9001质量管理体系,也已审核通过TUV作为全球制造和持有 一个GMC认证。 顾客是上帝,是我们的服务宗旨,我们的客户在欧洲,南亚,南美,非洲等地区,我们期待着您的出席,并做长期的业务和你在一起,我们一定为您提供周到的服务。

CFL灯贸易术语
1.付款方式:T / T,生产前30%的存款,以支付70%余款
发货前
2.生产周期:40天存款时
3.样品可以交付免费
4.航运运价是根据您的要求报价
5.航运港口:上海/宁波,中国内地
6.折扣是根据订单数量提供
7.最小起订量:3000PCS

CFL灯常见问题解答:
1,起订量? 付款期限? 交货港?发货日期?
最小起订量:
1000个/项目基于现有的包装;
最小起订量为定制色卡为每个项目5000个
付款期限:
T / T,30%订金,70%,此前的检查和分娩前
交货港:
上海,宁波
交货时间大批量生产:
40〜45天对确认订单
2,您的制造商?多久了你这样做了扩展插座?
是的,我们是专业的扩展插座制造商,在2003年其建立的。
有超过10年的生产经验。
3,哪里是你的工厂?
我厂地处临安杭州市,浙江省
4,如果是你的主要市场?
地球
| Packaging Details: | cfl light 1. blister box/ color box/ foam box 2. 1 pcs/ box, 100 boxes/ carton 3. Carton Size: 53*26*24 |
|---|---|
| Delivery Detail: | 40 days after making the confirmation of order |
Feature of the GEM cfl light
1. cfl light Available with E14/ E27/ E26/ B22 cap
2. Extremely long life time cfl light: ≥ 8000hours
3. The performance is stable, low failure
4. Good quality with competitive price
5. Suitable for house, supermarket, hotel, office...
6. Saves 80% more energy than ordinary incandescent lamp
7. Noiseless, no flare, protecting the eyes, green and environment friendly
cfl light
T2 half spiral cfl light
Item NO. | Power (W) | Lumens (Lm) | Lamp base | breadth Size (mm) | length Size (mm) | Package | Carton (CM) |
| DEM/ S-5 | 5 | ≥250 | E14/ E27/ E36/ B22 | 45 | 90 | 100 | 53*26*24 |
| DEM/ S-7 | 7 | ≥340 | E14/ E27/ E36/ B22 | 45 | 95 | 100 | 53*26*25 |
| DEM/ S-9 | 9 | ≥440 | E14/ E27/ E36/ B22 | 45 | 100 | 100 | 53*26*26 |

cfl light production process





exhibition


Certification-cfl light:
With the mission of quality first', the strictly control of QC, and the six xigema management , Most of our products have been granted CE Rosh certifications, have passed ISO9001 quality management system , also have been audited by TUV as the Global Manufactory and hold a GMC certification. customer is God is our service aim, we have customers in European, South Asia , South America, Africa, and other areas , we are looking forward your attend and do long business with you , we are surely to offer you a good service.

cfl light trade terms
1. Payment: T/ T , 30% deposits before production, 70% balance to be paid
before shipment
2. Production lead time : 40days upon deposit
3. Sample can be delivered for free
4. Shipping freight are quoted under your requests
5. Shipping port: shanghai/ ningbo , Mainland China
6. Discounts are offered based on order quantities
7. MOQ: 3000pcs

cfl light FAQ:
1-MOQ? Payment term? Delivery port?Shipping date?
MOQ:
1000pcs/ Item based on existing packing;
MOQ for customize color card is 5000pcs per item
Payment term:
T/ T-30% deposit and 70% after inspection and before delivery
Delivery port:
Shanghai , Ningbo
Lead time for mass production:
40~45 days against confirmed order
2-Are you manufacturer?how long have you do the extension socket?
Yes, we are professional extension socket manufacturer, which establish in 2003.
having over 10 years production experience.
3-Where is your factory?
Our factory is located in LIN'AN HANGZHOU City, ZHEJIANG Province
4-Where is your main market?
Globe