Product parameters:




Cast iron platform included : Three-dimensional flexible welding base platform, crossed platform, basic platform, grinding platform, riveting platform, standard crossed platform, fitter platform pliers, T-slot platform (T-slot plate), rail trough iron platform cast iron rail, Inspection platform, assembly level, welding platform and other cast iron measuring products.
Material: cast iron plate with HT200-300 casting, material ingredients when the raw material content plus ingredients as follows (%): carbon content: 3.1-3.4, manganese: 0.6-0.9, silicon: 1.5-2.0, sulfur <0.12, 0.3. Hardness> 180, secondary tempering treatment. 


Cast iron slide structure in line with the characteristics of casting casting strength, thin-walled multi-ribs, good rigidity, anti-deformation ability, each castings have been high-temperature annealing and two aging treatment,
High-precision double-nut ball screw drive, bearing capacity, dynamic performance, high precision machining;
Skateboard and rail contact surface using a unified plastic, the advantages:
① small dynamic friction factor, sliding flexibility, low speed without crawling;
② good wear resistance, long life, extended maintenance time.
Cast iron slip table with a reasonable oil tank, full of oil lubrication, as long as the sliding contact surface there is oil into the lubrication, to avoid dry friction, to minimize the contact surface wear, long-term accuracy;


2. About size GB standard gauges I have a spot with the director, received orders, 72 hours of delivery; non-standard measuring tool can be customized, the production period is short, please rest assured purchase.
3. About the color Shops selling goods prices are excluding taxes and fees, for tax votes, please contact customer service
4. On the off If you can not get a timely response to the consultation, please contact the sales manager. Sales Manager Tel: 15103271458 (24 hours online)
5. On the delivery Products are wooden packaging, non-customized products single 50kg following products made ordinary courier, usually within 72 hours of arrival; single 50kg or more products using logistics and distribution, your city has a direct line of preference, remote or small towns are The general arrival time is 4-7 days. Delivery costs to the logistics company's actual offer, subject to the sale of merchandise shops are not included in the transport costs. If you special requirements of courier, air and railway express their own shipping fee.
