Product parameters:

Cast iron platform included : Cast iron clamp bench Auto and motorcycle assembly platform with drawer mold fitter workstations Three-dimensional flexible welding base platform, crossed platform, the basic platform, grinding platform, riveting platform, standard crossed platform, bench pliers, T-slot platform (T-slot plate) Inspection platform, assembly-level, welding platform, and other cast iron measuring products.
Material: cast iron plate with HT200-300 casting, material ingredients when the raw material content plus ingredients as follows (%): carbon content: 3.1-3.4, manganese: 0.6-0.9, silicon: 1.5-2.0, sulfur <0.12, 0.3. Hardness> 180, secondary tempering treatment.










Modification table / cast iron platform The precision of the working surface is mainly flatness, and the T-groove flat working surface is the positioning criterion of the workpiece and the fixture, and there is a certain relationship with the direction of movement. In order to make the workpiece and the cast iron flat face contact are close and reliable, The maximum value of the straightness error on the table in each direction (vertical, horizontal, diagonal, radiation) is used as the flatness error of the work surface. The measurement method and the straightness of the guide rail are measured The method is basically the same, and the method can be checked by method, method, level and optical straightness.
Cast iron clamp table technical requirements:
1, the platform must be subject to two back stress stress aging treatment, to prevent the deformation of stress memory distortion and the future use of the platform into the phenomenon of cracks in the occurrence of the elimination of casting stress, the purpose of rough stress, stress relief of 90%
2, the working face finished the acute angle blunt;
3, the casting surface to be processed without external force, polished, the inner surface are required to paint anti-rust paint;
4, flat face can not seriously affect the appearance and performance of sand holes, pores, cracks, slag, shrinkage, scratches, bumps, rust and other defects.
3, the accuracy grade 0 ~ 3 flat working surface, the diameter of less than 15mm of sand holes allow the same material blockage, the hardness should be less than the hardness of the same material.Faceface blocked sand holes should not be more than 4 And the distance between the sand holes should not be less than 80mm.
4, the plate should be high-quality fine gray cast iron or alloy cast iron and other materials, the face hardness should be 170 ~ 220HB.
5, the flat face is usually applied to use scraping process.For scraping the three-stage flat working face, the surface roughness Ra of the maximum allowable value of 5чm.
7, the flat face with the scraping process should be carried out on the color of the test. The proportion of contact area after the inquiry shown in Table 3, or 25mm × 25mm in the number of points of contact should not be greater than 5 points Controversial, according to the ratio of contact area for the assessment basis.
8, the plate relative to the two sides, there should be installed handle or ring device screw hole (or cylindrical hole), and the device location should be designed to minimize the deformation caused by handling.
9, if the flat face set on the working hole (or groove), the location should not be higher than the face.

1. manufacturers supply genuine
2. About size GB standard gauges I have a spot with the director, received orders, 72 hours of delivery; non-standard measuring tool can be customized, the production period is short, please rest assured purchase.
3. About the color Shops selling goods prices are excluding taxes and fees, for tax votes, please contact customer service
4. On the off If you can not get a timely response to the consultation, please contact the sales manager. Sales Manager Tel: 15103271458 (24 hours online)
5. On the delivery Products are wooden packaging, non-customized products single 50kg following products made ordinary courier, usually within 72 hours of arrival; single 50kg or more products using logistics and distribution, your city has a direct line of preference, remote or small towns are The general arrival time is 4-7 days. Delivery costs to the logistics company's actual offer, subject to the sale of merchandise shops are not included in the transport costs. If you special requirements express, air and railway express their own shipping fee.

