Product parameters:
Order phone: 13311991609; 021-57800887
National service hotline: 400-057-9096
Pro: the above list price for the price of one meter!













Light steel frame and continuous hot-dip zinc plate is made of high quality as raw material, and is formed by cold bending process rolling skeleton of metal for building. For gypsum board, decorative plaster board, LIGHT BOARD finishes do non-load-bearing walls and roofs of plastic decoration. For a variety of plastic decoration of the building's roof, internal and external walls of the building and scaffolding-ceiling of the base material. Ceiling keel and keel cut off by use, according to section v-shaped, c-shaped, t-shaped, l-shaped keel. With a light weight, high strength, fit waterproof, shockproof, dustproof, insulation, sound-absorbing, temperature and other effects, but also has a short, simple construction advantages such as widely used by users and design.
Light steel frame and high quality cold rolled hot dip galvanized coil is used as raw material, even material, high strength, good steel. Galvanized on both sides than the national standard, fully guaranteed corrosion resistance of light-gauge steel, rust. High quality raw materials guarantee the excellent light-gauge steel construction.
Thickness of this wall keel in strict accordance with GB, when installing drywall nail into good, not only greatly improve the speed of construction, and ensure the firm connection of gypsum boards and keels.
The light steel frame and high dimensional accuracy, linearity is good, the thickness meets the requirements, planing plate, as gypsum board skeleton, without distortion, without bending, not twisted, not Alice, can effectively prevent the drywall when installing internal stress, avoid the appearance of cracks.
Another supporting through the heart of the Dragon, and keel, supports, anchors, and gypsum board, special self tapping and so on.
Installation instructions:
Fourth step: install the keel along the top and along the keel: according to put the partition line, press line installed top of keel and keel, mounted in the body with a nail, nail nail margin of 600mm.
Fifth step: vertical-keel: according to wall wire entrance location, after the installation of keel, hood Panel specification 900mm or 1200mm sheet width, tranche sizes for 450mm, less than modulus of graded should avoid the first block cover Panel of the door frame where the broken edge gypsum cover Board is not in a door box office.
Sixth: install the keel: document location for installing the Center keel, and insert both ends up and down along the top of the keel the keel and keel, after adjusting the vertical and accurate positioning, riveted by pumping heart; Wall or column edge keel with a nail or wood screw and wall, fixed column, nail margin 1000mm.

Since the establishment of the company, with its complete specifications, quality products, real prices, attentive service, was widely praised by customers. ' The credibility of development ' to ' quality of life ', is the company's business philosophy. Company step by step, the future, establish a brand. For present customers with first-class products and first-class service at home and abroad!
Staff belief : Truth-seeking, pragmatic, United struggle dedicated love bravely assumed responsibility for active cooperation innovation
Quality philosophy : Using professional techniques to create excellent quality; With professional services to meet the various needs of customers
Enterprise development : Committed to Create ' lang Shi-long international brand image; Committed to full manifestation of the advanced productive forces; Committed to pilot industrial high-end ceiling industry development; Is committed to promoting quality of life
Enterprise idea : Our efforts to promote American technology, quality management