Wholesale custom | Beijing roads every other fence cast iron Pier | U-type fence square blocks of ductile iron railing base

Wholesale custom | Beijing roads every other fence cast iron Pier | U-type fence square blocks of ductile iron railing base

10+
72 CNY (10.49USD)

add to cart

Product parameters:

  • Brand: Xiao Mei
  • Model number: GB
  • Customized processing: Yes
  • Use: fence base
  • Specifications: 300*400*150
  • Surface treatment: cleaning spray
  • Length: 40
  • Scope of application: municipal road
  • Height: 15
  • Type: isolated Pier
  • Material: iron













My company mainly engaged in the production of various fence base road squats, weight. Castings, Elevator parts, machinery parts, Corporation has a number of professional production factory, the powerful production capacity, will produce various types of ductile iron, gray cast iron, cast iron, cast steel, cast 15000 tons. Company technology capacity strong, quality management strictly, quality means complete, on user orders by requirements of quality, number, date has powerful of production and quality guarantee capacity, I company to by pig iron, coke carbon raw materials base; and quality excellent, can full meet production using, we products is development has this a advantage, in accumulated has years design, manufacturing casting casting of based Shang, used has new structure, technology, new process and quality of casting material, constantly of research and development, production of products has design reasonable, Stable structure, high accuracy, abrasion resistance. Long service life and so on. Street Pier durability is also reflected in the new fence products is now a strong ability to adapt to the environment. They are better able to withstand the local environmental problems, and hydrochloric acid and other chemical substances, does not change its performance and protection, can well ensure that its appearance, but also positive effects of city image.







Road blocks For the thin-walled hollow piers: Pier concrete construction can be sliding or over-form construction, construction of new and old concrete surface cleaning and cutting hair, to make bridge the same color, should use the same kind of cement. Pier construction should pay attention to install the girder, 0th bracket embedded components. Main Pier cast should be at least the first time pouring 2Meter high hollow Pier, main Pier section height should be at least 4.5M, to reduce the stiffness of concrete shrinkage cracks. Pier perpendicularity tolerance not greater than 1/1000And Pier Center location and design of location deviation of the section must not be greater than 2Centimetre. Pier install veneer on the surface of cold rolled ribbed welded mesh, mesh between the long plug, plug a long du is not less than 20Centimetre. Piers and concrete pouring age difference between the CAP shall not be greater than 20Days. Piers were not set up ladders and ventilation holes, the construction units can be set according to the needs, but not truncate the original structure of steel bars.