Product parameters:
model / Item No | 5669 |
Origin Place of origin | Guangdong Province, Jiangmen City, Kaiping Shuikou KaiPing county Jiang Men City, Guangdong Province, China |
Brand Brand Name | And the bathroom Deltar Sanitary Ware |
The main body material Body Material | high quality 59#Refined copper, Lead content in line with national GB / T1176Lead standard, no harm to the human body ,Conforms to the environmental protection concept Solid Brass (Cu> 59%, Pb <1.8%, Fe <0.3%), high Cu, low Pb. |
handle Handle Material | The handle with high-density alloy, one molding, more texture Zinc-alloy |
Bubble device / Spout | Imported bubble, stable quality, feel comfortable. (With swivel spout) |
Surface treatment Surface Treatment | chrome /Gold-plated /Bronze /Champagne gold /Green bronze and so on Chrome finished Brushed Nickel, Oil rubbed bronze, Antique copper, Antique bronze, etc. |
Plating layer / Plating | Acid copper, nickel, chromium and other multi-layer plating, corrosion resistance ,Durable ( Ni: 8 to 10 μm, Cr: 0.2 to 0.3 μm) |
package Packing | Standard carton packaging + Bubble bag / Gauze bag (Carton marks can be designed according to customer requirements) A cloth bag + Bubble bag + Neutral inside box; Outer Package: (Also can according to your design to package) |
Spool Cartridge | The use of ceramic valve core, hardness, high quality, feel comfortable and light, to withstand 50More than 10,000 times the switch can still operate smoothly and effort, durable watertight 40mm Ceramic Cartridge For Smooth And Long Lasting Operation , Without leakage after use 500.000 times |
Features Function | Hot and cold water function
For hot and cold water |
MOQ / MOQ | 1pcs |
Certifications Management certification | ISO9001: 2000, CE, CUPC, WATER MARK |
payment method Payment term | 30% Of the deposit, the balance before delivery or inspection after payment. 30% depoist by T / T, the balance should be paid before loaded |
transport Transportation | Shipping /Domestic logistics /Domestic express delivery Sea Shipment |
Port of loading Load Port | Shenzhen /Shantou /Guangzhou port Shenzhen port / Shantou Port / GuangZhou Port |
Lead Time Delivery time | Received from the deposit 15Days of delivery, the specific delivery time based on detailed quantity and standards. 20 days after receiving the deposit |
Sample preparation time Sample ready time | If not a special sample, generally can be 3Days. 5 days |
Warranty date Warranty time |












