Instruction: 1. The ground should be wiped clean with a dry cloth to remove dirt and moisture before placing the IO-mat. 2. Pull the protective film from the bottom side of the IO-mat. 3. Place the mat onto the suited location. Care must be used to ensure a good fit. 4. Remove the printed instruction sheet on the top surface and the mat is ready for use. 5. When the top sheet becomes soiled, grasp the pull-tab and pull at a low angle towards the body. Lead time: within 3-4 weeks / depending on quantity