CHARACTERISTICS:
1.The lid is equipped with safety valve and air releasing valve. When the steam pressure exceeds 0.16MPa, the safety valve can automatically release the pressure that is too high, having double safety function and featuring safety and reliability in use. The lid is also equipped with a pressure gauge with megabar and temperature readings, which conveniences the user.
2.The product can also use liquefied petroleum gas and coal stove as the heating energy. The product is heated by the immersed electro-thermal tube.
3.The container and drum adopted stainless steel 0Gr18Ni9Ti, anti-acid, anti-alkali and anti-rust.
TECHNICAL DATA:
| Model Technical Data | YX-280B | YX-280B(Deepened) |
| sterilizing volume | 18L (φ280×265 mm)mes;265 mm)mes;265 mm) | 24L (φ280×390 mm)mes;390 mm)mes;390 mm) |
| working pressure | 0.14 MPa | 0.14 MPa |
| Max. safety pressure | 0.165Mpa | 0.165Mpa |
| power / consumption | AC220V.50Hz / 2KW | AC220V.50Hz / 2KW |
| dimension | 400×400×420 mm×420 mm420 mm×420 mm | 400×400×630 mm×630 mm630 mm×630 mm |
| N / G. W | 14 / 16KG | 15 / 17KG |
Contact us:
Add: Room 618, New Wanli Plaza, No.9 Baixia Road, Nanjing, China
Tel: +86-025-84452678 Mobile: +88-13951660247 / 17701595378
www.healicom.com
1.What is time of delivery?
Since our products are produced according to each specific order, the delivery period will be 15days after confirmation of order. If it is small or sample order, please do check with us about whether we have ready goods in stock to make delivery as soon as possible.
2.What about quality assurance?
We offer one year warranty period beginning from the time of shipment for medical equipment, Per minor problems, we can provide free spare parts for replacements, Per serious problems, we can make replacement of free charge. But if the machine is damaged due to rough handling during the transportation, we are free of any responsibility, but we will still provide help to the buyer issue claims against the shipping company or insurance company, thus all the spare parts or expenses should be borne by buyer.