| Packaging Details: | 1ps/ ctn Standerd neutral Package Product Weight 360g Package Weight 465g Product Size 93mm (L) x93mm (W) x80mm (H) Package Size 132mm (L) x130mm (W) x105mm (H) |
|---|---|
| Delivery Detail: | 1-5days |
1/3 color sony ccd ir dome camera
( Model No.: GD-6112S )

* 700TVL CCTV Dome Camera
* 1/3 SONY CCD
* Standard Lens 6mmIR Sensetive Lens
(optional Lens 3.6/6/8/12/16mm)
* Φ8*10 ps
*IR Distance: 20metre
* power: DC12V/ 1.5A
520TVL/ 650TVL/ 700 Optional

1. Day/ night switch automatically, the monitoring effect is very clear at night
2. Special customer-built Sensitive IR F1.2 Lens
3. Using metal mount fixed the Lens, can effectively avoid the Lens focal problem when the lens is very hot.
4. Double glass design, it can effectively avoid the flare and speckle phenomenon when auxiliary light on. The front-end uses optical toughened glass.

The Paper is A4 Paper

Model No. | GD-6812P | GD-6912S | GD-6312S | GD-6212S | GD-6112S |
Image Sensor | 1/4 SHARP CCD | 1/3SONY CCD | |||
Resolution | 420TVL | 520TVL | 650TVL | 700TVL | |
Low Illumination | 0Lux IR ON | ||||
SNR | ≥52dB | ||||
Video out Rate | 1.0Vp-p75Ω | ||||
Scan Mode | Interlaced Scanning | ||||
Electronic Shutter | 1/50~1/100000 Second | ||||
White Balance | Auto | ||||
Backlight Compensation | Auto | ||||
AGC | Auto | ||||
Day&Night Convert | Auto | ||||
Dynamic detection | Internal synchronization | ||||
Gamma Correction | R=0.45 | ||||
IR LED | Φ8 X 10ps IR Led | ||||
IR Distance | 20M | ||||
Infrared Wavelength | 850nm | ||||
Lens | Standard Lens 6mm | ||||
Operating Voltage | DC12V/ 1000mA | ||||
Operating Temperature | -10°C~+50°C | ||||
Product Weight | 360g | ||||
Package Weight | 465g | ||||
Product Size | 93mm (L) x93mm (W) x80mm (H) | ||||
Package Size | 132mm (L) x130mm (W) x105mm (H) | ||||








Choose Guardian, Choose Guardian product, you will benefit from;

Arrange Item:
1. Production Lead Time: 3~5days
2. Private labeling and distributorships are offer under discussion.
3. Our own design and product development without any patent problem.
4. We welcome you to visit our factory.
1. Payment: T/ T only 30% deposits before production, 70%balance to be paid before deliver (Western Union are welcomed)
2. Production Lead Time for 50~100pcs: 4~7days
3. Sample can be delivered in 3days