| Packaging Details: | color box/ blister pack |
|---|---|
| Delivery Detail: | 40 days after order |
energy saving lamp CE E27 T3 15w full spiral lighting bulb
1. tri-color/ mixed powder
2. saving 80% energy
3. packing: color box , blister box, foam box
4. OEM and SKD are both acceptable
5. optional housing : PBT
6. average time: 8000hours/ 6000hours
7. color rendering index: 80
8. power factor: 0.5-0.6/0.9-0.95
9. certificate: GME/ CE/ ROHS/ ISO9001
details data:
watt: 13W/ 15W/ 18W |
operating voltage: 110-130v / 220-240 V |
Height: 110mm/ 116mm/ 128mm |
Ø: 48mm |
socket: E27 / B22/ E26/ E14 |
useful luminous flux: 660 lm/ 800 lm/ 1010lm |
color temp.: 2700 K/ 4000K/ 6400K |
tube diameter: T3 |
content of Mercury (: 2.5 mg |
starting time (: 1.0 |
starting time up to 60% luminous flux: (60 |
Power factor: 0.5 |
Number of switching cycles ) =: 10000 |
certification: CE/ ROHS/ ISO9001 |
Technique: Energy Saving |
Dimmable: No |
Rated life time: 3000/6000/8000/10000 h |
| model | Power: W | Lumens | lamp size: mm | lamp base | ps/ carton |
| DEN/ M-11 | 11 | 530 | 48*105 | E26/ E27/ B22 | 50/100 |
| DEN/ M-13 | 13 | 660 | 48*110 | E26/ E27/ B22 | 50/100 |
| DEN/ M-15 | 15 | 800 | 48*116 | E26/ E27/ B22 | 50/100 |
| DEN/ M-18 | 18 | 1010 | 48*125 | E26/ E27/ B22 | 50/100 |


office and workshop





products process


We attend ligting fairs abroad every year.



certification

energy saving light trade terms
1. Payment: T/ T , 30% deposits before production, 70% balance to be paid before
shipment
2. Production lead time : 40days upon deposit
3. Sample can be delivered for free
4. Shipping freight are quoted under your requests
5. Shipping port: shanghai/ ningbo , Mainland China
6. Discounts are offered based on order quantities
7. MOQ: 3000pcs
FAQ- energy saving bulb factory |
| 1-MOQ? Payment term? Delivery port?Shipping date? MOQ: 1000pcs/ Item based on existing packing; MOQ for customize color card is 5000pcs per item Payment term: T/ T-30% deposit and 70% after inspection and before delivery Delivery port: Shanghai , Ningbo Lead time for mass production: 40~45days against confirmed order 2-Are you manufacturer?how long have you do the extension socket? Yes, we are professional extension socket manufacturer, which establish in 2003. having over 10 years production experience. 3-Where is your factory? Our factory is located in LIN'AN HANGZHOU City, ZHEJIANG Province. 4-Where is your main market? Globe |