QDY hook bridge crane casting molten metal is mainly used for lifting metallurgy, casting and other places, working-level machine for the A7, at the bottom of the main beams and set up insulation. Crane assembly and test compliance with the State Administration of Quality Supervision, Inspection and Quarantine special document issued by the Office of Quality (2007) 375. place other lifting non-metallic material and lifting the molten hot solid metal is also reference to the selection.
Environmental conditions:
1, a three-phase AC power supply crane, rated frequency 50HZ, rated voltage of 380V;
2, the working environment temperature -10 ℃ ~ 60 ℃;
3, at a temperature of 40 ℃ relative humidity less than 50%;
4. exceeds the requirements, according to contract terms execution orders according to user requirements.
Ordering Information:
User when ordering or contract, must be the technical parameters of the machine (rated capacity, lifting height, span, etc.) clearly described, in order to satisfy the conditions required to provide working conditions and product.
Technical parameters Technological Parameter
| From the weight lifting weight | t | 16/3.2 | 20/5 | ||||||||||||||||||||||
| Span span | m | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 | 28.5 | 31.5 | 10.5 | 13.5 | 16.5 | 19.5 | 22.5 | 25.5 | 28.5 | 31.5 | ||||||||
| Maximum lifting height max. Lifting height | Main hook main hook | m | 16 | 12 | |||||||||||||||||||||
| Deputy hook auxiliary hook | m | 18 | 14 | ||||||||||||||||||||||
| Speed Speed | Main lifting main | m/ min | 10.7 | 9.8 | |||||||||||||||||||||
| Deputy lifting auxiliary | 14.6 | 15.5 | |||||||||||||||||||||||
| Trolley trolley travelling | 44.6 | 44.6 | |||||||||||||||||||||||
| Carts running crane travelling | 76 | 89 | 76 | 89 | |||||||||||||||||||||
| Motor motor | Main hook main hook | kw | 37 | 45 | |||||||||||||||||||||
| Deputy lifting auxiliary | 11 | 15 | |||||||||||||||||||||||
| Trolley trolley travelling | 3.7 | 3.7 | |||||||||||||||||||||||
| Carts running crane travelling | 2 *7.5 | 2 *11 | 2 *7.5 | 2 *11 | |||||||||||||||||||||
| Main dimensions (mm) main dimensions | BQ | 6278 | 6188 | 6798 | 6278 | 6188 | 6798 | ||||||||||||||||||
| B | 4400 | 5000 | 4400 | 5000 | |||||||||||||||||||||
| b | 230 | 260 | 230 | 260 | |||||||||||||||||||||
| S1 | 1040 | 1030 | |||||||||||||||||||||||
| S2 | 2310 | 2320 | |||||||||||||||||||||||
| S3 | 1850 | 1930 | |||||||||||||||||||||||
| S4 | 1500 | 1420 | |||||||||||||||||||||||
| K | 2000 ±2 | 2000 ±2 | |||||||||||||||||||||||
| Bx | 2400 | 2430 | |||||||||||||||||||||||
| H | 2095 | 2097 | 2187 | 2185 | 2097 | 2099 | 2189 | ||||||||||||||||||
| H1 | 878+H0 | 1005+H0 | 845+H0 | 1005+H0 | |||||||||||||||||||||
| H2 | 80 | 180 | 280 | 340 | 490 | 640 | 790 | 940 | 80 | 184 | 284 | 344 | 492 | 642 | 792 | 940 | |||||||||
| H3 | 2500 | 2600 | 2700 | 2760 | 2910 | 3060 | 3210 | 3360 | 2500 | 2604 | 2704 | 2764 | 2912 | 3062 | 3212 | 3362 | |||||||||
| H4 | 729 | 727 | 637 | 639 | 701 | 699 | 609 | ||||||||||||||||||
| Weight weight | Trolley trolley | kg | 6780 | 7439 | |||||||||||||||||||||
| The total weight of total weight | 21500 | 23600 | 26000 | 30500 | 32600 | 37050 | 40700 | 44020 | 22800 | 25100 | 27490 | 31920 | 35400 | 39300 | 42970 | 46850 | |||||||||
| The maximum wheel pressure max wheel load | kn | 163 | 174 | 187 | 203 | 214 | 227 | 241 | 254 | 195 | 209 | 220 | 244 | 255 | 267 | 282 | 296 | ||||||||
| Recommended by rail steel track | Trolley trolley | 24 kg / m | |||||||||||||||||||||||
| Crane crane | 43kg / m or QU70 | ||||||||||||||||||||||||
| Mains power source | Three-phase AC 380V 50HZ 3-Phase A. C. 380V 50HZ | ||||||||||||||||||||||||
Data and charts in this catalog is provided for informational purposes only, detailed parameters, please call our confirmation.