Specifications:
Any color is available for bicycle bags/hydration backpacks
Size: 45*16*2cm
Materials: rips top or customized
OEM and ODM designs are welcomed
Features:
1. Main zipper compartment to hold your stuff with mesh shoulder strap
2 . Breathable mesh back panel for comfortable carrying
3. Lightweight to carry, suitable for climbing/cycling/outdoor
4. The main compartment is covered with super lightweight serves two functions
5. Ergonomic design on the back for maximum breathability and comfortable reflective strips for safe riding at night
About Atom:
Sample lead time: 5-15 working days to make sample and check the quality
Delivery lead time: fast and on-time to meet customer's requirement
Certificates: BSCI, FLA, Avon, Walmart, ISO9001 and more
More than 10 years of bag production experience
Inspects semi-finished goods on production line
All products are under strict quality control
FAQ:
Q: Are you a factory?
A: Yes, we are factory
Q: What is your MOQ?
A: In generally, 1000pcs for each color and each style
Q: Where is your factory?
A: Our factory is located in Quanzhou, Qingmeng, near Jinjiang Airport and Xiamen Airport
Q: How many workers in your factory?
A: About 500 workers
Q: What famous brands do you cooperate with?
A: Umbro, Puma, Walmart
| Item | 2016 hot selling hydration pack for hiking with 1.5L water bladder |
| Mode no. | AB-J212 |
| Material | ripstop or customized |
| Size | 45*16*2cm |
| Color | As pictures that you found and customized |
| Logo | Customized |
| Specifications | 1. Main zipper compartment to hold your stuff with mesh shoulder strap 2. Breathable mesh back panel for carry comfortable 3. Lightweight to carry, suit for climbing/cycling/outdoor 4. The main compartment is covered with super light 5. Ergonomic design on the back for maximum breathability and comfort. Reflective strips for safe riding at night. |
| Customized | OEM & ODM are welcome |
| Price | FOB $6.34-6.63 |
| MOQ | 1000pcs for each style each color |
| Sample time | 5-15 days |
| Packing details | 1Each bags put into a poly bag and then into export carton 2It' s up to customers' requirement |
| Delivery time | 35-50 days after the final sample that you confirmed and received your deposit |
| Standard | CPCIA/EN71/REACH/ASTM F963 |
| Payment terms | 1T/T 30% deposit in advance and 70% balance against the copy of B/L 2. L/C |