Customized processing | Cast iron faceplate | Level 1 Machinist assembly line for t-slot table scraping plate

Customized processing | Cast iron faceplate | Level 1 Machinist assembly line for t-slot table scraping plate

400-3600 CNY (58.25-524.17USD)

add to cart

Product parameters:

  • Processing customization: Yes
  • Type: crossed plate
  • Brand: Yongjun
  • Model: 1500 * 2000mm
  • Accuracy: 1 level
  • Material: HT200
  • Face hardness: HB200
  • Specifications: 1500 * 2000mm, 1000 * 1000mm, 500 * 500mm, 600 * 900mm








Cast iron platform includes: three-dimensional flexible welding base platform, crossed platform, the basic platform, grinding platform, riveting platform, the standard crossed platform, bench pliers, T-slot platform (T-slot plate) Cast iron rail, inspection platform, assembly-level, welding platform, such as cast iron measuring products.

Material: cast iron plate using HT200-300 casting, material ingredients ingredients and ingredients according to the following criteria (%): carbon: 3.1-3.4, manganese: 0.6-0.9, silicon: 1.5-2.0, sulfur <0.12, phosphorus < 0.3. Hardness> 180, the second tempering treatment.







Cast iron plate It is specially designed for the flattening of large equipment with reasonable design, stable structure, high precision and abrasion resistance. It can be used for flattening from 3000mm to 6000mm. The product is made by scraping or grinding. Measurement, and grinding of machining centers, tool shops, machine shops, inspection and maintenance workshops, large-sized equipment bases, measuring chambers and precision machining, and accurate measurement and inspection of the flatness, flatness and angle tolerance of workpieces. .

Repair mold / cast iron platform T-groove flat working surface is the workpiece and fixture positioning reference, and movement between the direction of a certain relationship, in order to make the workpiece and cast iron flat face contact close and reliable, the plane (Vertical, horizontal, diagonal, radiation) on the straightness error in the maximum value as the work surface of the flatness error.The measurement method and guide the straightness of the measurement The method is basically the same.Use point method, plug-foot method, level and optical flatness and other methods of inspection.


Cast iron platform technical requirements:

1, the platform must be twice after the stress stress aging treatment to prevent the deformation of the stress memory distortion and the future use of the platform in the occurrence of cracks in the phenomenon of elimination of casting stress, roughing the purpose of stress, stress relief of more than 90%

2, the face of processing at the end of sharp angle;

3, the casting surface to be processed without external force, polished, the inner surface are required to paint anti-rust paint;

4, flat face can not seriously affect the appearance and performance of sand holes, pores, cracks, slag, shrinkage, scratches, bumps, rust and other defects.

3, the precision level of 0 to 3 on the flat face, the diameter of less than 15mm sand hole allows the same material to block, the hardness should be less than the same material hardness of the face of the sand hole should be no more than 4 And the distance between the sand holes should be not less than 80mm.

4, the plate should be used high-quality fine gray cast iron or alloy cast iron and other materials, the face hardness should be 170 ~ 220HB.

5, flat face is usually used in the use of scraping processing. For the use of scraping the processing level of the three flat face, the surface roughness Ra maximum allowable value of 5 ч m.

7, the flat face with the scraping process should be carried out on the color of the test. The proportion of contact area after the inquiry shown in Table 3, or 25mm × 25mm in the number of points of contact should not be greater than 5 points Controversial, according to the ratio of contact area for the assessment basis.

8, the plate relative to the two sides, there should be installed handle or ring device screw hole (or cylindrical hole), and the device location should be designed to minimize the deformation caused by handling.

9, if the flat working surface set screw hole (or groove), the site should not be higher than the face.

1. Manufacturers supply authentic

2. About size GB standard gauges I have a spot with the director, received orders, 72 hours of delivery; non-standard measuring tool can be customized, the production period is short, please rest assured purchase.

3. About the color Shops sold goods prices are not tax, for tax votes, please contact customer service

4. About guest If your inquiry does not receive a timely reply, please contact the sales manager directly.

5. About shipping Products for the wooden box packaging, non-customized products, a single 50kg the following products made ordinary courier, generally within 72 hours of arrival; more than 50kg single product logistics and distribution, your city has a direct line of priority, remote or small towns are Freight logistics Peihuo, the general arrival time of 4-7 days. Shipping costs to the logistics company's actual offer shall prevail, the shops sold goods prices are not including transportation costs. If you require special express, air and rail express to be self shipping fee.